[Back]


Talks and Poster Presentations (with Proceedings-Entry):

L. Lingitz, Ch. Morawetz, D. Gigloo, S. Minner, W. Sihn:
"Modelling of flexibility costs in a decision support system for mid-term capacity planning";
Talk: 46th CIRP Conference on Manufacturing Systems, Sesimbra; 2013-05-29 - 2013-05-31; in: "Procedia CIRP - 46th CIRP Conference on Manufacturing Systems 2013", P. Cunha (ed.); Elsevier, 7 (2013), ISSN: 2212-8271; 539 - 544.



English abstract:
economically to the volatile external situations. In this paper, we develop a cost model with respect to the capacity envelope
concept. Generic flexibility measures are used and described by numerous influence factors and constraints. Furthermore, the cost
model will be demonstrated as a mixed-integer linear model and is finally integrated in a decision support system for mid-term
production planning. The resulting problem can be solved with commonly available standard solvers. Finally, we will show
numerical results from practice.

Keywords:
aggregate production planning; capacity flexibility; production flexibility; mid-term capacity planning; work-time account


Electronic version of the publication:
http://publik.tuwien.ac.at/files/PubDat_219649.pdf


Created from the Publication Database of the Vienna University of Technology.