D. Adam, R. Markiewicz:
"Foundation, deep excavation, and dewatering scheme for a 250 m tall high-rise building in Vienna";
Vortrag: XVI European Conference on Soil Mechanics and Geotechnical Engineering, Edinburgh (eingeladen); 13.09.2015 - 17.09.2015; in: "Geotechnical Engineering for Infrastructure and Development", ICE Publishing, Volume 3 (2015), ISBN: 978-0-7277-6067-8; S. 887 - 892.



Kurzfassung englisch:
The construction of the Donau City Tower 1 has been recently accomplished; it is the first of two high-rise buildings in the
so called "Donau City" in the north of Vienna. The DC Tower 1 is one of the tallest buildings in Europe and comprises a height of 250 m
above ground, 20 m of underground floors, and a 35 m deep foundation. The execution of the deep excavation and the deep foundation of
the Donau City Tower 1 made great demands on ground engineering. The geotechnical relevant works contained the construction of the pit
supporting system for the excavation pit and deep foundation works for the tower consisting of numerous diaphragm wall elements with
depths up to 30 m, and CFA piles for the foundation of shallow building parts. A special challenge was the design and execution of the dewatering
scheme to remove the water in the quaternary soil and for lowering the water pressure in the tertiary soil layers.

Schlagworte:
foundation, deep foundation, deep excavation, dewatering scheme


Elektronische Version der Publikation:
http://publik.tuwien.ac.at/files/PubDat_242044.pdf


Erstellt aus der Publikationsdatenbank der Technischen Universität Wien.