M. Villa, R. Bergmann, H. Böck, M. Kroc, M. Proks, V. Valenta, M. Kase, J. Herrmann, J. Matousek:
"The New I&C System Of The Triga Mark Ii Reactor Vienna";
in: "RRFM European Research Reactor Conference 2016", European Nuclear Society (Hrg.); herausgegeben von: European Nuclear Society; European Nuclear Society, Brussels, Belgium, 2016, ISBN: 978-92-95064-25-6, S. 496 - 503.



Kurzfassung englisch:
The TRIGA Mark-II reactor was installed by General Atomic (San Diego, California, U.S.A.) in the years 1959 through 1962, and went into operation for the first time on March 7, 1962. The TRIGA Mark II reactor in the Viennese Prater is part of Atominstitut which was founded in 1958 as an inter-university institute for all Austrian universities and started operation in 1962, when the TRIGA Mark II research reactor of the institute was officially opened. As part of the reform of the university system, the Atominstitut was integrated 2002 into the Faculty of Physics at the TU Wien. The operation of the reactor since 1962 has averaged 220 days per year, without any long outages. During the last 50 years 3 different I&C systems were in use to control the reactor power and safety related parameters. From 3 different vendors, Skoda, Invap and GA, the Skoda company located in Pilsen was chosen in November 2013. The main work is done together with the subcontractor dataPartner.


Elektronische Version der Publikation:
http://publik.tuwien.ac.at/files/publik_254708.pdf


Erstellt aus der Publikationsdatenbank der Technischen Universität Wien.